Riverford Farm

Riverford Farm

 Case Study Riverford Farm June 2018 232 kWp – Design, supply, install and commission. The Riverford Farm Solar PV farm consists of 10 rows of ground-mounted solar PV. There are 15 SMA inverters connected to a dedicated substation. The system is monitored remotely and...
The Blue Sea Food Company

The Blue Sea Food Company

 Case Study The Blue Sea Food Company June 2018 The Blue Sea Food Company, a Paignton based sustainable crab fishing company, are on a mission to go green and, thanks to an installation by renewable energy company Beco Energy, have considerably reduced their carbon...
Beech Torr Farm

Beech Torr Farm

 Case Study Beech Torr Farm August 2018 250 kWp – Design, supply, install and commission. The Beech Torr Solar PV farm consists of 7 rows of ground-mounted solar PV. There are 13 SMA inverters connected to a dedicated substation. The system is monitored remotely and...
Olympus Business Park

Olympus Business Park

 Case Study Olympus Business Park July 2018 250 kWp – Design, supply, install and commission. The Olympus Business Park Solar PV installation consists of multiple PV arrays installed across 7 rooftops providing solar energy to 15 business units across the site. Annual...
Lescaze

Lescaze

Lescaze Offices, previously part of the Dartington Estate were designed by the Swiss born, American architect William Lescaze in 1920s. Lescaze offices are a rare and original example of modernist architecture which has resulted in it being designated as a Grade 2...
Cedar Tor Ltd

Cedar Tor Ltd

 Case Study Cedar Tor Ltd April 2018     Cedar Tor Ltd   2.2kWp – Design, supply, install, test and commission Design Black Modules – 8 x Trina TSM-DC05A.05 275Wp Monocrystalline Modules (Tier 1) Inverter – 1 x Solis Mini Single Tracker...