Lescaze

Lescaze

Lescaze Offices, previously part of the Dartington Estate were designed by the Swiss born, American architect William Lescaze in 1920s. Lescaze offices are a rare and original example of modernist architecture which has resulted in it being designated as a Grade 2...
Off-Grid Domestic Hybrid System

Off-Grid Domestic Hybrid System

  The Brief Beco were approached to design a hybrid of wind and solar power system complemented with a battery bank.  The result was off-grid, energy independence for this home in Somerset. Assessment The first step was to check that a grid connection was not...
Eccleston Court Care Home

Eccleston Court Care Home

ECO-MAX COMMERCIAL EMC200i. Over 11.4% average energy savings achieved by the ECO-MAX, with a payback of under 3 years. Project Summary Installation of 1 x EMC 200i Voltage Optimiser on the supply at Eccleston Court Care Home. Community Integrated Care (CIC) Is one of...
The National Trust

The National Trust

 Case Study The National Trust – Belton House June 2018   Project Summary   Installation of 1 x EMC 250i Voltage Optimiser on the supply at Belton House The National Trust   A charity organisation that works to preserve and protect historical places. The National...
Cedar Tor Ltd

Cedar Tor Ltd

 Case Study Cedar Tor Ltd April 2018     Cedar Tor Ltd   2.2kWp – Design, supply, install, test and commission Design Black Modules – 8 x Trina TSM-DC05A.05 275Wp Monocrystalline Modules (Tier 1) Inverter – 1 x Solis Mini Single Tracker...
Betfred

Betfred

 Case Study Betfred – Multi Site Roll Out Project September 2018 Project Summary   Multi-site roll-out programme across Betfred sites nationwide, with initial random 5 site selections to analyse savings achieved Betfred   A large independent Bookmakers,...