Case Studies

Riverford Farm

Riverford Farm

 Case Study Riverford Farm June 2018 232 kWp – Design, supply, install and commission. The Riverford Farm Solar PV farm consists of 10 rows of ground-mounted solar PV. There are 15 SMA inverters connected to a dedicated substation. The system is monitored remotely and...

read more
The Blue Sea Food Company

The Blue Sea Food Company

 Case Study The Blue Sea Food Company June 2018 The Blue Sea Food Company, a Paignton based sustainable crab fishing company, are on a mission to go green and, thanks to an installation by renewable energy company Beco Energy, have considerably reduced their carbon...

read more
Trinity Marine

Trinity Marine

Throughout Beco’s long history, strong relationships have been built with customers and suppliers alike. These relationships are absolutely key to Beco’s success and we are proud in the knowledge that customers bring their return business to Beco time and again....

read more
Beech Torr Farm

Beech Torr Farm

 Case Study Beech Torr Farm August 2018 250 kWp – Design, supply, install and commission. The Beech Torr Solar PV farm consists of 7 rows of ground-mounted solar PV. There are 13 SMA inverters connected to a dedicated substation. The system is monitored remotely and...

read more
Olympus Business Park

Olympus Business Park

 Case Study Olympus Business Park July 2018 250 kWp – Design, supply, install and commission. The Olympus Business Park Solar PV installation consists of multiple PV arrays installed across 7 rooftops providing solar energy to 15 business units across the site. Annual...

read more
Lescaze

Lescaze

Lescaze Offices, previously part of the Dartington Estate were designed by the Swiss born, American architect William Lescaze in 1920s. Lescaze offices are a rare and original example of modernist architecture which has resulted in it being designated as a Grade 2...

read more
Off-Grid Domestic Hybrid System

Off-Grid Domestic Hybrid System

  The Brief Beco were approached to design a hybrid of wind and solar power system complemented with a battery bank.  The result was off-grid, energy independence for this home in Somerset. Assessment The first step was to check that a grid connection was not...

read more
Eccleston Court Care Home

Eccleston Court Care Home

ECO-MAX COMMERCIAL EMC200i. Over 11.4% average energy savings achieved by the ECO-MAX, with a payback of under 3 years. Project Summary Installation of 1 x EMC 200i Voltage Optimiser on the supply at Eccleston Court Care Home. Community Integrated Care (CIC) Is one of...

read more
The National Trust

The National Trust

 Case Study The National Trust – Belton House June 2018   Project Summary   Installation of 1 x EMC 250i Voltage Optimiser on the supply at Belton House   A charity organisation that works to preserve and protect historical places. The National Trust has chosen...

read more