Case Studies

Environment Agency Solar Power

The Brief To provide an off-grid power source for an eel counter at the Environment Agency site at Teddington Lock, Surrey. The System Beco Energy Solutions indentified a PV solar power kit as the most suitable technology. The system used pumps to draw water from one...

read more

Solar Powered Water Pump

The Brief Our client, the Totnes Allotment Society, needed up to 4,000 litres of water a day to be pumped from a stream at the bottom of the plot into header tanks at the top. A grid connection was prohibitively expensive. The System Solar power was ideal for this...

read more

Trinity Marine

Throughout Beco’s long history, strong relationships have been built with customers and suppliers alike. These relationships are absolutely key to Beco’s success and we are proud in the knowledge that customers bring their return business to Beco time and again....

read more

Lescaze

Lescaze Offices, previously part of the Dartington Estate were designed by the Swiss born, American architect William Lescaze in 1920s. Lescaze offices are a rare and original example of modernist architecture which has resulted in it being designated as a Grade 2...

read more