 Case Study Cedar Tor Ltd April 2018     Cedar Tor Ltd   2.2kWp – Design, supply, install, test and commission Design Black Modules – 8 x Trina TSM-DC05A.05 275Wp Monocrystalline Modules (Tier 1) Inverter – 1 x Solis Mini Single Tracker...
Betfred

Betfred

 Case Study Betfred – Multi Site Roll Out Project September 2018 Project Summary   Multi-site roll-out programme across Betfred sites nationwide, with initial random 5 site selections to analyse savings achieved Betfred   A large independent Bookmakers,...
Driver Hire

Driver Hire

 Case Study   Driver Hire February 2018   Driver HirePlymouth, Cornwall & South Devon Commercial Solar Installation 25.92kWp – Design, supply, install and commission. Maximum grant secured from The Carbon Trust.   Design Solar Modules – 96 x JA Solar...